BIOGAS CHANNEL
en
BIOGAS CHANNEL
en
              • topics
                • Associations
                • Research
                • Market and Policy
                • Case history
                • Biogas cogeneration
                • Anaerobic digestion
                • What is biogas?
                • Applications and technologies
                • events

                  Follow us on

                  netzerotube
                  • English
                  • Italiano
                  • Deutsch
                  • Français
                  • Home
                  • Case history
                  Fill 29
                  10.20.2016

                  Brazil: a 29.5MW landfill biogas plant, one of the biggest in the world

                  Case history
                  The plant is located in Caieiras, São Paulo. 21 modules, 8,000 tons of waste treated a day, and an installed capacity of 29.5MW to supply electricity to a city of 300,000 inhabitants. Part of the energy produced is used by the plant, and the remaining part is sold to the grid. The project, baked by Solvì - a leading company in ecological waste treatment - considering the success of the Minas do Leão plant, was unveiled at COP21 Paris 2015. The plant meets the targets of Brazil’s Solid Waste Policy and allows for considerable reductions in CO2 emissions.
                  Original language: English
                  Origin: Brazil

                  Speaker

                  Carlos Alberto Bezerra
                  Director of Termoverde Caieiras

                  Next videos

                  03:08
                  10.27.2023

                  Excellent performance for cogeneration engines – including those powered by biomethane - thanks to MOTUL OIL

                  Guido Garbarino,Simone Rivaroli,
                  04:10
                  9.28.2023

                  For the last stage of the Farming Tour, focus on digestate and minimum processing techniques

                  CIB (Consorzio Italiano Biogas)
                  03:27
                  6.30.2023

                  The third stage of the Farming Tour arrives for the first time in Friuli-Venezia Giulia at the Azienda Agricola Principi di Porcìa e Brugnera

                  CIB (Consorzio Italiano Biogas)
                  04:03
                  5.10.2023

                  The FarmingTour organised by the CIB returns: first appointment in Piedmont, at the Cooperativa Speranza

                  CIB (Consorzio Italiano Biogas) ,Serena Vanzetti,

                  Published by
                  
AB Group

                  AB Energy
                  Via Caduti del Lavoro, 13
                  Orzinuovi (BS)
                  Italy

                  Follow us on

                  Privacy Policy/Cookie Policy
                  © 2022 AB ENERGY SPA Tutti i diritti riservati | P.IVA 02106060987 | REA 417582 | Reg. imp. BS02106060987