Plant technology and operation

From design to commissioning. Factors to take into consideration for installing a CHP plant

Christopher McArdle - Mechanical Engineer, PWI Engineering

During the design phase of a cogeneration plant, the first step is to understand what kind of energy the company where installation will take place needs, in order to ensure maximum results and maximise ROI. It is also important to choose between a stick built plant and a packaged CHP plant. The last step is the commissioning phase where the operation of the system is tested. 

  • Publication date: 20/10/2016
  • Original language: English
  • Origin: United States
  • Duration: 0:03:26