COGENERATION CHANNEL
en
COGENERATION CHANNEL
en
              • topics
                • Associations
                • Market and policy
                • Case History
                • Renewable gases
                • Energy efficiency and cogeneration
                • Applications
                • Beyond the plant
                • events

                  Follow us on

                  netzerotube
                  • English
                  • Italiano
                  • Home
                  • Technologies and components
                  Fill 29
                  10.19.2016

                  From design to commissioning. Factors to take into consideration for installing a CHP plant

                  Technologies and components
                  During the design phase of a cogeneration plant, the first step is to understand what kind of energy the company where installation will take place needs, in order to ensure maximum results and maximise ROI. It is also important to choose between a stick built plant and a packaged CHP plant. The last step is the commissioning phase where the operation of the system is tested.
                  Original language: English
                  Origin: USA

                  Speaker

                  Christopher McArdle

                  Next videos

                  03:03
                  3.27.2024

                  Shell, an integrated energy company, supports cogeneration in the energy transition

                  Alessandro Richelmi
                  03:08
                  3.15.2024

                  The decarbonisation challenge for the Energy & Power market according to Rittal S.p.a.

                  Giacomo Zambruno
                  02:32
                  2.21.2024

                  Cogeneration combined with carbon capture and utilisation (CCU) technology

                  Anna Pavlova
                  01:51
                  2.8.2024

                  Petro Canada Lubricants confirms its commitment to the gas power and pipeline sector

                  Luis Rodriguez

                  Published by
                  
AB Group

                  AB Energy
                  Via Caduti del Lavoro, 13
                  Orzinuovi (BS)
                  Italy

                  Follow us on

                  Privacy Policy/Cookie Policy
                  © 2022 AB ENERGY SPA Tutti i diritti riservati | P.IVA 02106060987 | REA 417582 | Reg. imp. BS02106060987